燃氣發(fā)電機組出廠前試驗過程大家了解嗎
我公司生產(chǎn)的每臺燃氣發(fā)電機組出廠前必須經(jīng)過嚴格的檢驗合格后方可出廠。我公司燃氣發(fā)電機組的響應過程如下:
Each gas generator set produced by our company must pass strict inspection before leaving the factory. The response process of gas generator unit of our company is as follows:
首先,將燃氣發(fā)電機組按具體生產(chǎn)要求進行封裝,并準備在試驗臺上進行試驗。
Firstly, the gas generator set is packaged according to the specific production requirements, and is ready to be tested on the test bench.
1.將試驗燃氣發(fā)電機組注滿冷卻液和足夠的潤滑油,連接載重線電纜,安裝排煙管,連接啟動電池;
1. Fill the test gas generator unit with coolant and enough lubricating oil, connect the load line cable, install the smoke exhaust pipe and connect the starting battery;

2.初步觀察燃氣發(fā)電機組的安裝是否到位或安裝錯誤,是否有漏油或漏水現(xiàn)象,并對發(fā)電機的耐壓試驗、匝間試驗等各項指標進行試驗。有不合格項及時修改處理的;
2. Preliminarily observe whether the installation of gas generator unit is in place or wrong, whether there is oil leakage or water leakage, and test the voltage withstand test, turn to turn test and other indicators of the generator. Any unqualified item shall be modified and handled in time;
3.機組啟動成功后,空轉2-3分鐘,觀察是否有異常情況,確認沒有上升到高速1500rpm的異常情況。觀察各種測試數(shù)據(jù)。頻率為50HZ時,電壓為400V,油壓不低于硅發(fā)電機的油壓。直到水溫上升到60℃,開關已準備好進行負荷試驗時,機組一切正常。
3. After the unit is started successfully, idle for 2-3 minutes, observe whether there is any abnormal condition, and confirm that there is no abnormal condition rising to high speed 1500rpm. Observe various test data. When the frequency is 50Hz, the voltage is 400V, and the oil pressure is not lower than that of the silicon generator. Until the water temperature rises to 60 ℃, when the switch is ready for load test, the unit is normal.
4.根據(jù)燃氣發(fā)電機組的額定功率的大小分別隨著負載測試,25%,50%,100%負荷階段,如果每個荷載階段在50 hz頻率負載測試后,電壓在380 v - 420 v電源的功率因數(shù)乘以當前理論的系數(shù)條件下的數(shù)據(jù)符合負載電流閱讀作為一個合格的單位功率;觀察發(fā)動機在運行過程中振動和煙霧顏色的變化;根據(jù)發(fā)動機的標準,判斷沒有故障;
4. According to the rated power of the gas generator set, 25%, 50% and 100% load stages are respectively tested with the load. If the power factor of 380 V - 420 V power supply is multiplied by the current theoretical coefficient after the load test at 50 Hz frequency in each load stage, the data conforms to the load current reading as a qualified unit power; Observe the change of vibration and smoke color during the operation of the engine; judge whether there is any fault according to the standard of the engine;
5.燃氣發(fā)電機組試驗工作完成后,記錄試驗負荷,記錄試驗時間和試驗人員人數(shù),并將機組備案和記錄,對獲準出廠的合格機組進行密封。
5. After the completion of gas generator unit test, record the test load, test time and number of test personnel, record and record the unit, and seal the qualified unit approved to leave the factory.
以上是燃氣發(fā)電機組廠家小編為大家介紹的相關內容,想要了解更多內容,歡迎訪問網(wǎng)站:http://kmhxn.cn
The above is the relevant content introduced by the small edition of gas generator manufacturers. If you want to know more, please visit the website: http://kmhxn.cn